CIF Terms

Buying & Shipping · topic notes

The buyer-side facts on CIF terms: what is included, what it costs to add and how it is handled for an export order. no linked items yet filed under this topic.

What CIF Terms covers

A grinder quotation is configuration-dependent, so the useful number is the range for the size class, not a single figure.

How to specify cif terms

  • Ask for FOB and CIF side by side: the difference is insurance and freight, and it is usually smaller than buyers expect
  • Lead time starts at deposit, not at enquiry, and gantry machines add weeks for bed assembly
  • Confirm the voltage and phase before production, not before shipment
  • Packing specification should name the crate type, the desiccant and the rust preventive

Where cif terms goes wrong

Before confirming, ask for three things in writing: the configuration list, the packing specification and the inspection record that ships with the machine.

Machines and reading for cif terms

Topics in this vocabulary point to a machine line rather than to a single offer, so the answer stays useful when the model range changes. For cif terms the closest line is gantry series surface grinders; the selection guide and the accuracy notes cover the neighbouring questions.

Products

Machines filed under this topic, plus the closest models from the line it belongs to.

PSG-12040GM Double Column Gantry Surface Grinder (1200 × 400 mm)

PSG-12040GM Double Column Gantry Surface Grinder (1200 × 400 mm)

Compact double-column gantry grinder for long narrow plates that a horizontal machine cannot reach cleanly.
Details
PSG-32130GM Double Column Gantry Surface Grinder (3200 × 1300 mm)

PSG-32130GM Double Column Gantry Surface Grinder (3200 × 1300 mm)

3200 × 1300 mm double-column gantry grinder for large mould bases and press tools.
Details
PSG-40100GM Double Column Gantry Surface Grinder (4000 × 1000 mm)

PSG-40100GM Double Column Gantry Surface Grinder (4000 × 1000 mm)

4000 × 1000 mm gantry grinder for 4 m plates with a narrow column footprint.
Details

Blog Articles

Cases & Solutions

Questions about CIF Terms

What is the lead time?

Standard hydraulic and manual machines run four to six weeks from deposit; PLC and CNC machines six to ten weeks; gantry beds are quoted per bed length.

Are FOB and CIF prices available?

Yes, both from Shanghai or Ningbo. The CIF figure adds insurance and ocean freight to the named port, and both are quoted on the same configuration.

Related topics

← Browse all topics  ·  Ask an engineer about this topic
WhatsApp