Our Certifications

Quality certifications and compliance credentials

ISO 9001:2015 — Quality Management System
ISO 9001:2015 — Quality Management System
CE — Declaration of Conformity, PSG Series
CE — Declaration of Conformity, PSG Series
TÜV — Electrical Safety & EMC Certificate
TÜV — Electrical Safety & EMC Certificate
SGS — Pre-Shipment Inspection Report
SGS — Pre-Shipment Inspection Report
Material Certificate — Cast Iron Base & Column
Material Certificate — Cast Iron Base & Column
Laser Interferometer Calibration Report
Laser Interferometer Calibration Report

What the certificates are, and what they are not

A certificate on a website proves a system exists; it does not prove a machine is accurate. Both matter, and it is worth knowing which one you are looking at:

  • ISO 9001 certifies the quality management system — that there are documented procedures, records and corrective actions, and that they are audited. It is what makes a test-part record trustworthy, because the process that produced it is controlled.
  • CE marking is a declaration that a machine meets the applicable European directives — machinery, low voltage and electromagnetic compatibility — and that a technical file exists. A CE declaration of conformity ships with every machine exported to the EU or to a customer who requires it.
  • Material and component certificates cover the castings and the bought-in bearings, screws and drives. These are traceable documents from the supplier, not marketing badges.

What none of them do is replace the acceptance test. Ask for the test-part record and the laser record for the specific serial number you are buying — that is the document that tells you what your machine does, and we send it as standard. How each tolerance is measured, and on what, is set out on the accuracy and inspection page.

The document pack that ships with each machine

  • Test-part record: flatness, parallelism and surface roughness figures from a ground sample.
  • Laser record: positioning and squareness, on CNC, PLC and gantry builds.
  • CE declaration of conformity where applicable, plus the electrical diagram.
  • Operation and maintenance manual in English, with the parameter backup for the control.
  • Spare-parts list with part numbers, so a replacement can be ordered by number rather than by photograph.
  • Crating list, packing list and the export documents: commercial invoice, packing list, bill of lading, certificate of origin on request.

Compliance questions that come up in procurement

Can you supply a certificate of origin? Yes, on request with the order.

Can a third party inspect before shipment? Yes — SGS, Bureau Veritas or your own inspector, at the plant before crating. Tell us at the order stage so the schedule allows for it.

Is the electrical configuration certified for my country? The machine is built to your destination's voltage and frequency, and components carry their own approvals. Where a local equivalent of CE is required, say so at the order stage and we confirm what we can supply.

What about spares and warranty documentation? 12 months warranty with a defined scope, and spares held for 15 years. Both are written into the warranty and service terms, which is the page to read alongside this one.

Next: see how this works in practice on the factory page, or read what customers actually measured after installation.

WhatsApp