Shipping & Export

How PyeahGrind ships a surface grinder: fumigated seaworthy crating, container loading…

How a machine leaves the factory

A surface grinder is a precision casting, not a boxed appliance. Shipping damage almost always comes from three places: the wheelhead moving in transit, moisture reaching bare ways, and forklift impact during unloading. Our packing procedure targets all three.

Packing standard

  • Ways and ground surfaces coated with rust-preventive film and wrapped in VCI paper.
  • Wheelhead locked, table blocked, handwheels strapped.
  • Machine wrapped in stretch film, then in a fumigated plywood case with skids.
  • Accessories, manuals and the geometry report in a sealed box inside the crate.
  • Lifting points marked, and a loading diagram sent before dispatch.

Container loading

Machine sizeLoadingTypical ports
up to 1000 × 500 mm1 unit in a 20' GPNingbo / Shanghai
1500 × 700 mm1 unit in a 40' GPNingbo / Shanghai
2000–3000 mm1 unit in a 40' FR or flat rackNingbo / Shanghai
Gantry (3200 mm and above)Break-bulk or multiple flat racksNingbo / Shanghai

Incoterms and documents

We quote FOB Ningbo or Shanghai by default, and CIF or DAP on request. The document set includes commercial invoice, packing list, bill of lading, certificate of origin (Form E for ASEAN, Form B for some Gulf destinations where applicable), CE declaration where the destination requires it, and the geometry inspection report.

For Southeast Asia, Form E can reduce the import duty substantially — ask us to prepare it before shipment, not after.

Installation planning

Machines above 3 tonnes need a prepared foundation: a level concrete pad, anchor bolts set to the drawing, and 48 hours for the concrete to cure before levelling. We supply the foundation plan with the order, and can supervise installation by video call or send a technician on site.

Lead time

Standard models ship in 25–45 days from receipt of deposit, depending on whether a chuck, DRO or control option is ordered. Gantry machines and special widths take 60–90 days. Spare parts ship by air within 72 hours.

Need help?

Questions about a machine, accuracy, shipping or export terms? Our engineers reply within one working day.

WhatsApp