Surface Grinder Export FAQ

Lead time, FOB and CIF terms, packing and documentation

Export questions are commercial as much as technical: what leaves the factory when, what the price actually covers, and which documents the customs broker will ask for. The answers below are the ones we repeat on almost every first order, written so a purchasing team can forward them internally without a follow-up call.

What Incoterms do you quote?
FOB Ningbo or Shanghai by default, and CIF or DAP on request. For Southeast Asian buyers we prepare Form E for preferential duty where applicable. Prices are in USD.
What is the lead time?
Standard models ship 25–45 days after deposit, depending on options. Gantry machines and special widths take 60–90 days. Spare parts ship by air within 72 hours.
What payment terms do you accept?
30% deposit by T/T and 70% before shipment is the standard. L/C at sight is accepted for orders above USD 50,000. For repeat dealers we discuss open-account terms after the first two orders.
How is the machine packed for sea freight?
Bare ways and ground surfaces are oiled and wrapped in VCI paper, the wheelhead is locked and the table blocked, then the machine is stretch-wrapped and packed in a fumigated plywood case with skids. Accessories, manuals and the inspection report go in a sealed box inside the crate.
Do you supply CE-compliant machines?
Yes. Machines for the EU and for destinations that require CE can be built with CE wiring practice and a CE declaration, including the electrical panel documentation. Specify this at the order stage, since it changes the panel build.
WhatsApp